TRADES FOR TITANS HIGHLIGHTS

Quarter 3 - Jan 2018

Trades For Titans was established in early 2018 as a Partnership, the owners found a small share workshop giving them 200 square metres. They manufactured their first products being temporary fence stillages. They also bought their first lathe and forklift. 

TradesForTitans_NoBackground_edited_edit

Brand was established

From%20starting%20day_edited

New lease for starting workshop, shared building leasing 200 sqm to TFT

Stillages made

Prototype block stillages manufactured.

IMG_1604

First manual lathe purchased and repaired

Stillage photo 2

Temporary Fence Stillages designed, prototyped and sold.

Quarter 4 - April 2018

CNC purchased July to fix

First CNC lathe purchased - Mori Seiki SL4t

Utilising new CNC 4

First batch work for CNC machining

Machines components 2

First CNC machined components

DT Big bushes

Finished bushes machined in workshop.

Quarter 4 was exciting when our first CNC lathe was bought and sited ready for us to repair, we fixed the lathe and ran our first paying machined jobs through it.

Quarter 1 - July 2018

Drilling angle on mill

First Manual Mill - Microcut.

Milling flats on bushes

First milling on the Microcut.

IMG_1337

Components machined on Microcut, facing, drilling and tapping.

Quarter 1 2018 TFT purchased their first manual milling machine to start being able to offer the second operations. First chips were made after some crucial tooling purchases.

Quarter 2 - October 2018

Machines being operated old wshop

Small workshop at full capacity.

New%20workshop%20leased%20sign_edited

New workshop lease signed in Malaga, from 200sqm to 350sqm unit.

New workshop filling up

New workshop being filled up.

Quarter 2 - 2018, TFT had outgrown their 200 sqm starting shop and decided to move from Ashfield to Malaga, new workshop had 350 sqm with yard access.

Quarter 3 - January 2019

Screenshot 2021-02-09 172610

Trades For Titans Pty Ltd becomes a company.

IMG_1102

Hafco BM-53VE manual mill purchased still wrapped.

IMG_1130

Hafco manual mill unwrapped ready for production.

IMG_1308

Mori Seiki SL5H bought from the Eastern States and installed.

IMG_1301

Mori Seiki SL5H still on truck.

Quarter 3 - 2019, TFT became a company and started purchasing more fixed assets. A Hafco BM-53VE was the second manual mill added along with the second CNC lathe, a Mori Seiki SL5H.

Quarter 4 - April 2019

IMG_1785 2021-02-10 00_31_20

Director Luke leaves full time employment to focus on TFT.

IMG_1780 2021-02-10 00_31_20

Director Adam leaves full time employment to focus on TFT.

IMG_1896 2021-02-10 00_31_20

Twin Navara's were purchased for customer visits and deliveries.

IMG_1970 2021-02-10 00_31_22

Intricate bronze bushes made utilising milling and turning capability.

IMG_1934 2021-02-10 00_31_21

Special bushes made utilising turning and milling capability.

IMG_1940 2021-02-10 00_31_21

Pipes bored and fitted ready for welding.

57837230612__432EE7A6-33F1-4C77-8A4B-242

First deep profile turning in lathe.

Quarter 4, 2019 - Both directors now fully pledged their time to TFT, they obtained a couple of vehicles and hit the road to drum up some new clients, this came with new machining to increase their capability.

Quarter 1 - July 2019

IMG_2916%202021-02-10%2001_05_34_edited.

Plasma bed refurb contract won.

IMG_2374 2021-02-10 01_05_34

Miscellaneous machined components.

IMG_3168 2021-02-10 01_05_34

Plasma bed refurb work in progress.

IMG_3206 2021-02-10 01_05_34

Turning, grooving and threading, increasing capabilities.

IMG_2350 2021-02-10 01_05_33

Quality machined and assembled rollers.

Quarter 1, 2019 - TFT won a plasma bed refurb contract that it carried out, then increased capability with some different machining work coming through the door.

Quarter 2 - October 2019

Quarter 2, 2019 - This quarter we seen our milling increase dramatically which pushed us to commit to a CNC VMC for the next quarter. A couple more clients joined our list varying our scope of works offered.

IMG_3342 2021-02-10 03_45_55

Block milling, batch work.

IMG_3591 2021-02-10 03_45_56

Block milling, batch work.

IMG_3549 2021-02-10 03_45_55

Intricate multi stage turning and milling.

IMG_3508 2021-02-10 03_45_55

Turning and milling.

IMG_3519 2021-02-10 03_45_55

Fabrication work.

IMG_3786 2021-02-10 03_45_56

Last truck for the year.

Quarter 3 - January 2020

IMG_4028 2021-02-11 00_22_25

Ethan, 1st year Fitter and Machinist starting day.

IMG_4106 2021-02-11 00_22_25

Mazak mill being scrapped.

IMG_4293 2021-02-11 00_22_30

Patria forklift being scrapped.

IMG_3957 2021-02-11 00_22_25

Large batch work machining.

IMG_4315 2021-02-11 00_22_30

Doosan 6700L arrival day.

IMG_4374 2021-02-11 00_22_30

Training day on Doosan 6700L.

IMG_4416 2021-02-11 00_22_30

First components for the year.

Quarter 3, 2020 - This quarter was an explosive start for TFT in 2020, a large reshuffle of assets and huge spike of work. Ethan commenced a Fitter and machinist apprenticeship with us. We scrapped a forklift and had it upgraded with a replacement, also removed a Mazak mill due to non repairable issues but have replaced it with a brand new Doosan 6700L mill, such a beast.

Quarter 4 - April 2020

IMG_4880 2021-02-11 00_57_39

New Mori Seiki SL25 being installed.

IMG_4887 2021-02-11 00_57_39

New Mori Seiki SL25 being installed.

IMG_4708 2021-02-11 00_57_39

Miscellaneous machined components.

IMG_5028 2021-02-11 00_57_45

Miscellaneous machined components.

IMG_4839 2021-02-11 00_57_45

Miscellaneous machined components.

Quarter 4, 2020 - In this quarter we again added to the asset pool purchasing another CNC lathe, Mori Seiki SL25 was installed. Shop is starting to fill up now, thoughts have been about moving in the near future.

Quarter 1 - July 2020

Quarter 1, 2020 - We had another post crane installed this quarter but had eyes on another CNC lathe, unfortunately we were outgrowing our unit and went on the hunt for a bigger shop. We found this opportunity around the corner in a workshop we have been eyeing off for the last couple of years, lease was executed at the end of quarter.

IMG_5259 2021-02-11 01_21_50

Adam showing off his colours.

IMG_5484 2021-02-11 01_21_50

Second post crane being installed, workshop getting crowded.

IMG_5151 2021-02-11 01_21_50

Miscellaneous machined components.

IMG_5477 2021-02-11 01_21_50

Opportunity for new workshop found.

IMG_5635 2021-02-11 01_21_50

New workshop lease agreed upon, Mulgul Road.

Quarter 2 - October 2020

IMG_5666 2021-02-11 01_51_17

Lines marked for machines in prep at Mulgul.

IMG_5776 2021-02-11 01_51_17

Cranes installed at Mulgul.

IMG_5820 2021-02-11 01_51_22

Moving the big Doosan 6700L in.

IMG_5842 2021-02-11 01_51_22

Heavy machines sited.

IMG_6202 2021-02-11 01_51_22

New Doosan Puma 2600SY lathe arrives.

IMG_6242 2021-02-11 01_51_22

New Doosan Puma 2600SY lathe installed.

Quarter 2, 2020 - In this quarter we had minimal downtime with the move, moved all of our heavy assets and were back into operation within the week whilst cleaning the old facility in the interim. Our next lathe arrived which is a game changer for us, the Doosan 2600 SY.

Quarter 3 - January 2021

IMG_6644

Bushes, caps and small shaft ends

IMG_7186

Large QT80 wedges

IMG_6881

Big hollow caps machining

IMG_6940

5S improvements, marking out machine envelopes and laydown areas

IMG_7255

Bushes and guides machining

IMG_6674

Large guides and small shaft turning with threads

Quarter 3, 2021 - This quarter we were on the hustle machining whatever we could get our hands on to improve cashflow to pay for the move, we also started working on our 5S improvements for the shop layout.

Quarter 4 - April 2021

IMG_7765

Miscellaneous collets

IMG_7740

Special links

IMG_8175

Big Josh, Apprentice Fitter and Machinist

IMG_7776

Special wheel hubs

IMG_7452

Machined all over, drill and tapped hubs

IMG_7864

Fabricated components

Quarter 4, 2021 - This quarter we continued to hustle out the machining jobs bringing on board some new clients and welcoming Josh to the team offering another Apprenticeship.

Quarter 1 - July 2021

IMG_7601
IMG_7719
IMG_8183
IMG_8040
IMG_7737
IMG_8125
IMG_8161

Quarter 1, 2021 - This quarter was fun, added a 5T overhead gantry to our capability along with a barfeeder on the Puma 2600SY that we have named "Marvo", the start of our lights out game. Along came Zona to duel trade with us, already setting and programming.

Quarter 2 - October 2021

IMG_8923
IMG_8809
IMG_8881
IMG_8933
IMG_8448
IMG_8544
IMG_8724
IMG_8603

Quarter 2, 2021 - This quarter was all about increasing our capability on the machines, taking on jobs that we would have never thought about doing in-house, it was a real think outside the box kind of quarter. Was great to close out a really busy year with a bang.

Quarter 3 - January 2022

IMG_9245
IMG_9181
IMG_9057
IMG_9571
IMG_9110
IMG_9022
IMG_9311
IMG_9251
IMG_9432
IMG_9487

Quarter 3, 2022 - Not sure why Zona is always laughing, we must have some funny jokes... Made our way to Kalgoorlie to let them know who we are and bring home some new work, nice and busy quarter with WIP. Oh, and we bought another hunker introducing another 2 axis lathe to our capability with a 12 inch chuck.

Quarter 4 - April 2022

IMG_9608
IMG_9653
IMG_9655
IMG_9968
IMG_0752
IMG_0051
IMG_0704
IMG_0089
IMG_0756

Quarter 4, 2022 - THE BEAST arrived, we installed a brand new Doosan 750L VMC early in the quarter and put it straight to work complimenting our other milling capability. Again took on some more weird and wonderful work boosting our capability using some CAM software Fusion 360. Oh and "pinchy" joined our team in the fish tank as head of security.

Quarter 1 - July 2022

IMG_1140
IMG_1141
IMG_1178
IMG_1194
IMG_1199
IMG_1205
IMG_1212
IMG_1224
IMG_1263
IMG_1266
IMG_1050
IMG_0979
IMG_0944
IMG_0928
IMG_1304

Quarter 1, 2023 - Well safe to say we started the 2023 financial year off with a bang, 1 week turnaround on a shutdown piece of mine equipment, lucky we had the beasts bed for this large piece of equipment. Then lots of odd machining and fabrication jobs all round.

Quarter 2 - October 2022

IMG_1378
IMG_1385
IMG_1396
IMG_1409
IMG_1412
IMG_1425
IMG_1497
IMG_1845
IMG_1854
IMG_1880
IMG_1855
IMG_1887
IMG_1846
IMG_2138

Quarter 2, 2023 - Boom, our next Puma arrived, we commissioned another Y axis mill turn but with a bigger chuck and tailstock. Then yet again, took on some more work to test out our capabilities.

TRADES FOR TITANS TBC...